Onicon System-10 BTU Instrukcja Użytkownika Strona 41

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 57
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 40
11451 Belcher Road South, Largo, FL 33773 • USA • Tel +1 (727) 447-6140 • Fax (727) 442-5699 • [email protected]
System-10 BTU Meter Manual 03/15 - 0651-16 / 18323 Page A-7
HEAVY DUTY THERMOWELL ASSEMBLY
FOR HIGH TEMPERATURE / PRESSURE
In Welded Pipe
For Process Temperatures Over 300F
Connection Head 1/2” Fitting
1/2” Coupling 1/2” Extension Nipple Heavy-Duty Thermowell with
1/2” NPT process thread
(Length varies with pipe size.)
When installing, apply wrench
here to tighten.
The thermowell, extension nipple, coupling and tting were made to a
specic length. DO NOT attempt to change the length of this assembly.
Retainer Springs
SS Spacer Sleeve
(Length varies with thermowell length.)
Platinum RTD
Transmitter
Step 1:
Drill 7/8” hole in pipe. Install thermowell using ttings supplied by ONICON.
Complete steps 2 - 4 only after all welding, brazing & soldering are complete.
NOTE:
Each RTD and transmitter pair are matched at the
factory and calibrated for a specic BTU meter. Do not
separate the RTD from the transmitter and use care
to ensure that the serial number on the transmitter
matches the serial number of the BTU meter.
Step 2:
Remove lid and insert RTD assembly into thermowell,
ensuring that it bottoms out. Thermal compound may
be used; apply only a pea-sized amount to the tip of
the RTD prior to insertion.
Thread retaining nut onto tting inside the bottom of connection head. Hand tighten the retainer nut.
DO NOT OVERTIGHTEN.
Retainer Nut
(Finger Tighten Only)
Przeglądanie stron 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 56 57

Komentarze do niniejszej Instrukcji

Brak uwag